Problem based project oriented project work in groups. The background of the project is a wind turbine system either a stand-alone or grid connected which has to be controlled under time varying loads and wind speed. Possible power quality and stability challenges are identified and formulated. The main components of the system are described and its requirements and specifications are given. The system is modelled and implemented using a simulation tool. The system is analysed with respect to power quality and stability. Methods, algorithms, devices for improving the power quality and stability of the entire system are proposed, developed and tested.
Since it is a 15 ECTS project module, the work load is expected to be 450 hours for the student
Name of exam | Interaction between Wind Power Generation Units and Electrical Loads or Power System |
Type of exam | Oral exam based on a project |
ECTS | 15 |
Assessment | 7-point grading scale |
Type of grading | External examination |
Criteria of assessment | As stated in the Joint Programme Regulations.
http://www.engineering.aau.dk/uddannelse/studieadministration/ |
Project on 2nd Semester Wind Power Systems.
Danish title | Interaktion mellem vindmøllegeneration og laster eller el-nettet |
Module code | N-EE-K2-3 |
Module type | Project |
Duration | 1 semester |
Semester | Spring
|
ECTS | 15 |
Empty-place Scheme | Yes |
Location of the lecture | Campus Aalborg |
Responsible for the module | |
Time allocation for external examiners | B |
Study Board | Study Board of Energy |
Department | Department of Energy Technology |
Faculty | Faculty of Engineering and Science |