Purpose
The purpose of the project unit is to contribute to students’
attainment of knowledge about fault detection, diagnosis and
relevant reliability analysis of engineering systems
Content
The project is based on a problem to monitor a process system,
which can be a chemical process, mechanical system, or any other
safety-critical systems. The reliability of the considered system
as well as individual components should be analyzed and assessed
using the probabilistic methods. The strategies and methods for
Fault Detection and Diagnosis (FDD) should be determined for the
considered system by taking some intelligent methods into
consideration. The chosen FDD solution has to be implemented on a
real-time platform and tested, either by the computer simulations
or a dedicated
hardware
Since it is a 15 ECTS project module, the work load is expected to be 450 hours for the student
Name of exam | Fault Diagnosis and Reliability Analysis |
Type of exam | Combined written and oral examination, Project
Exam |
ECTS | 15 |
Permitted aids | All written and all electronic aids |
Assessment | 7-point grading scale |
Type of grading | External examination |
Criteria of assessment | As stated in the Joint Programme Regulations.
http://www.engineering.aau.dk/uddannelse/studieadministration/ |
Project Module on 2nd Semester Intelligent Reliable Systems (IRS).
Danish title | Fejldiagnosticering og pålidelighedsanalyse |
Module code | EN-IRS2-1 |
Module type | Project |
Duration | 1 semester |
Semester | Spring
|
ECTS | 15 |
Empty-place Scheme | Yes |
Location of the lecture | Campus Esbjerg |
Responsible for the module | |
Time allocation for external examiners | B |
Study Board | Study Board of Energy |
Department | Department of Energy Technology |
Faculty | Faculty of Engineering and Science |